The problem

A portfolio migration is where one-app playbooks fall apart

Consolidating Posit Connect instances, moving off an ageing server, or stepping a whole estate through development, staging, and production sounds like the same job repeated. It is not. Every app carries its own package versions, its own data connections, its own schedules and access rules, and its own owner who needs it working on Monday.

Done app by app with no system, it stalls: dependencies clash, nobody is sure which apps are still used, and a single broken report erodes trust in the whole move. We run it as one governed programme, so the estate moves in order and nothing important goes dark.

When this fits

  • Instance to instanceMoving many apps between Posit Connect servers.
  • ConsolidationMerging several servers or teams into one estate.
  • Environment promotionClean dev, staging, and production paths.

What the migration covers

Eight stages, run as repeatable waves across the portfolio rather than one risky switchover.

1. Inventory

A full census of the estate: every app, its owner, how often it is used, and whether it is still needed, so the migration starts from fact rather than guesswork.

2. Dependency assessment

Package versions, system libraries, data connections, and credentials mapped per app, so nothing breaks because a hidden dependency was left behind.

3. Migration planning and waves

Apps grouped into waves by risk, usage, and shared dependencies, with a sequence that moves the safe work first and keeps critical apps covered throughout.

4. Automated deployment

Deployment driven by scripted, repeatable pipelines rather than manual publishing, so each wave moves the same way and the method improves with every pass.

5. Configuration migration

Access rules, schedules, environment variables, runtime settings, and content ownership carried across, so the app behaves the same on the far side.

6. Validation

Each migrated app checked against the source: output compared, behaviour confirmed, and documented evidence produced where the app supports regulated work.

7. Cutover and rollback

A planned switch for each wave, with the source kept available and a documented rollback path, so a problem means stepping back, not an outage.

8. Post-migration support

A stabilization period after cutover to settle issues, tune performance, and hand the estate back to your team, with ongoing support available if you want it.

A named delivery lead

One point of contact who owns the plan, reports progress wave by wave, and keeps your app owners informed from first inventory to final handover.

The Migration Factory

A repeatable line, not a hundred one-off moves

The first wave is the slowest, because that is where we build the line: the inventory template, the dependency checks, the deployment scripts, and the validation pack. Every wave after that reuses the same tooling, so the work gets faster and more predictable as it goes, and the quality holds steady instead of drifting with fatigue.

You get a productized, documented process you can see into, not a black box. If your team later wants to run waves themselves, the factory is theirs to keep.

Wave 1 Wave 2 Wave 3 One line, run the same way for every wave.

Why a factory beats ad hoc

  • RepeatableThe same scripted path for every wave.
  • Consistent evidenceThe same validation pack per app.
  • Visible progressStatus tracked app by app, wave by wave.
  • Yours to keepThe tooling and process handed to your team.

How the estate moves

From a source estate, through repeatable waves, to a validated portfolio on the target, with rollback available throughout.

Source estate Many R and Shiny apps Released in waves Wave 1 Wave 2 Wave 3 The Migration Factory: repeatable waves Inventory Dependencyassessment Automateddeployment Validation Cutover Target estate Validated portfolio on Posit Connect Rollback path, available at every step

The migration path and the rollback route, shown for illustration. Scope, waves, and sequence are set per estate.

Built for regulated estates

  • Clinical data know-howSDTM, ADaM, and CDISC work we do ourselves.
  • SAS to R fluencyWe speak both sides of a modernization.
  • Validation disciplineEvidence a GxP team can sign off.
What separates us from generic IT migration

We know what the apps do, not just where the files live

Many of these estates run clinical work. Moving them well means understanding the data and the analyses inside the apps, not just the servers under them. We bring the same discipline we apply to CDISC programming and validation and rescue, so a migrated app is not only running but trusted.

For the staged, run-it-in-parallel approach applied to a move off a legacy stack, see our legacy migration case study.

How we engage

Assess first, then migrate in scoped waves

Most programmes start with an R Application Portfolio Assessment so everyone sees the estate and the plan before committing to the move. From there the migration runs as scoped waves, with price agreed up front per wave or for the programme. We do not publish prices, because every estate is different.

Tell us how many apps you are moving and where they are going, and we will come back with a scoped quote.

Request a scoped quote

At a glance

  • ScopeDozens to hundreds of apps, run in waves.
  • TargetsPosit Connect instances and environments.
  • ReversibleA documented rollback path per wave.
  • Yours to keepThe migration factory handed to your team.

Questions we hear early

The practical points teams raise before a portfolio migration.

Do you migrate across instances, not just single apps?

Yes. The work is built for a portfolio: moving many apps from one Posit Connect instance to another, consolidating several instances, or stepping apps through development, staging, and production. We inventory the estate first, then migrate in waves.

How do you avoid breaking apps during a migration?

Each wave is deployed, validated against the source, and kept reversible. We run the migrated app alongside the original until output matches and owners sign off, with a documented rollback path for every wave.

What makes this different from a general IT migration?

The applications are R and Shiny, and many support regulated clinical work. We handle package and dependency resolution, environment reproducibility, and the validation evidence a GxP team needs.

Will our team be able to run waves without us afterwards?

Yes. The inventory templates, deployment scripts, and validation pack are documented and handed over, so your own team can keep migrating with the same factory once we step back.

Tell us how big the estate is

Share how many apps you are moving, where they live now, and where they are going. We will come back with a scoped plan and quote.

Request a scoped quote